eNews-banner

Construction news from AFS

E - News
Date Added: 28/10/2016

Wall to Wall November 2016

"The builder requested we investigate the feasibility of changing to afs logicwall® in lieu of blockwork walls to increase living space inside units and speed up construction time. The installation speed was quick, there was a good level of consistency through floor rises and the desired outcome for the client was achieved." CHRIS BEALE, STRUCTURAL ENGINEER, INERTIA ENGINEERING

E - News
Date Added: 07/07/2016

Wall to Wall July 2016

"AFS Logicwall® and AFS Rediwall® systems were chosen as load bearing structural elements on our Alexandria project due to their speed and cleanliness." GEORGE SARKIS, PROJECT MANAGER, CORDELL CONSTRUCTIONS

E - News
Date Added: 01/04/2016

Wall to Wall April 2016

‘‘Using afs rediwall® for the building’s cores and load-bearing walls saved money and alleviated pressure on the formwork critical path by virture of the speed and simplicity of its installation." GLEB ZINGER, PROJECT MANAGER, NORTH SHORE PROPERTY CONSTRUCTION

E - News
Date Added: 01/12/2015

Wall to Wall December 2015

"AFS ticked many boxes for this project and could be incorporated into various components of the building. It offered a structural solution, formed part of the external façade system, provided the necessary fire separation and was also a cost effective system within very tight site parameters.” NICK PELLE, DIRECTOR, OZTAL ARCHITECTS

E - News
Date Added: 01/08/2015

Wall to Wall August 2015

Within about 2 weeks we had shop drawings, within another 3 weeks we had panels on-site and then, unbelievably, we put up some 12,000m2 in around 13 weeks. I didn’t think anyone would be able to do that.” EDWARD HANNA, JSN HANNA
E - News
Date Added: 01/04/2015

Wall to Wall April 2015

This was our first time using afs logicwall®…the speed of construction and ease of materials handling impressed us…we didn’t need cranes and we’ve used it on two projects since." TONY MASALKOVSKI, MASBUILD

Newsletter See why these projects chose AFS walling