Rediwall® 0 m²
Logicwall® 3557 m²
Units
25storeys
4type
Multi-ResidentialAFS Logicwall® was used on the Arabella Apartments project in Port Hedland, WA for a number of reasons, including:
• Maximum speed of construction
• Minimum number of men on-site
• Dramatically reduced cranage
• Fully satisfies the cyclonic ratings – both direct wind loads and flying object protection
• Very efficient freight from Perth – lightweight product – approx. 250m² per load
Build time – from hitting site to practical completion was a total of 14 months which included one Christmas period and 3 cyclones!
Don’t just take our word for it
“Since completing Arabella Apartments, a 4 storey multi residential and commercial construction project we have begun construction on another 3 storey development also using AFS. As both projects are based in Port Hedland, AFS offers cyclonic benefits that are far superior to its steel counterparts allowing a reduction in cost and time while complying with the stringent requirements involved in building throughout the North
West of Australia.” – Builder
“We have used AFS Logicwall® on multi-level residential and mixed use projects within metropolitan Perth and in Port Hedland (Cyclonic Area). The system gives outstanding turnaround time for multi-level apartment/hotel buildings.” – Engineer